TIBALDI

Tibaldi – Melbourne New manufacturing facility in Clayton, 3000 m² of PIR panel used. 3 sliding doors, 7 PAN doors and 6 pedestrian doors all used in construction. Taking approximately 2 months to complete, it was installed and built to
Add New Blogs.
Tibaldi – Melbourne New manufacturing facility in Clayton, 3000 m² of PIR panel used. 3 sliding doors, 7 PAN doors and 6 pedestrian doors all used in construction. Taking approximately 2 months to complete, it was installed and built to
Santospirito Flower Warehouse – Melbourne New packing warehouse in Yarraville. 2500 m² of EPS panel used with Rapid Rise doors, hinge exit doors and sliding door installed. The project was installed and built to the Master Builders Association code of practice
Bid Foods Launceston The transport distribution company required freezer/chillers and marshalling area built from scratch. We used approximately 3000m² of PIR panel, along with the installation of sectional lift doors, rapid rise doors, loading docks and Tretight Inflatable Dock Seals.
New packing facility at an orchard in the Yarra Valley. 12,000 m² of PIR panel used. The project took roughly 4 months to complete and was installed and built to the Master Builders Association code of practice and the Insulated
Recent Comments